What the job involves
A Quantity Surveyor in real estate and infrastructure prepares cost estimates, bills of quantities, and tender documents, and manages payments and variations throughout a project. Day to day, they measure work on site, verify contractor bills, track budgets, and help control costs from design to handover. In a company like GVK Group, they work on large projects such as highways, airports, or commercial buildings, ensuring financial feasibility and contractual compliance.
Role and Technical Knowledge
- 1
What is the difference between a Bill of Quantities (BoQ) and a Bill of Materials (BoM)?
Explain that BoQ lists quantities of work items with descriptions for tendering and payment, while BoM lists materials needed for construction. Emphasise that BoQ is contract-focused and BoM is procurement-focused.
- 2
How do you calculate the quantity of concrete for a slab?
Describe measuring length, width, and thickness, then multiplying to get volume. Mention deducting openings and adding wastage as per norms.
- 3
What are the different types of contracts used in infrastructure projects?
Cover item rate, lump sum, percentage rate, EPC, and cost-plus contracts. Briefly state when each is suitable, such as EPC for turnkey projects.
- 4
What is the difference between nominal mix and design mix concrete?
Explain that nominal mix uses fixed proportions by volume for ordinary works, while design mix is engineered for specific strength and durability, often used in large projects.
Practical Scenarios
- 5
You notice that the actual quantity of steel reinforcement used on site exceeds the approved drawings. What do you do?
Say you would verify measurements, check for design changes or wastage, and raise a variation if justified. Highlight documenting findings and informing the project manager.
- 6
A contractor submits a bill for work not yet completed. How do you handle it?
Explain that you would physically verify progress, measure only completed work, and reject or reduce the bill accordingly. Mention following contract terms and maintaining transparency.
- 7
How would you prepare a cost estimate for a new residential tower?
Outline steps: study drawings, do quantity takeoff, apply current market rates, add overheads and contingency, and review with senior. Stress using historical data and software.
- 8
During a project, material prices increase unexpectedly. How can you mitigate the cost impact?
Suggest reviewing contract clauses for price adjustment, exploring alternate suppliers, and value engineering. Mention proactive communication with stakeholders.
Behavioural and Situational
- 9
Tell me about a time you had to work under a tight deadline.
Use STAR method: describe the situation, task, action (prioritising, seeking help), and result. Show ability to stay calm and deliver.
- 10
How do you handle disagreements with a senior on cost estimates?
Emphasise respectful communication, presenting data and logic, and being open to feedback. Show willingness to escalate if needed for project benefit.
- 11
Describe a situation where you found an error in your own work. What did you do?
Highlight honesty, quick correction, and learning from the mistake. Mention informing relevant people and preventing recurrence.
- 12
Why do you want to work as a Quantity Surveyor in infrastructure rather than buildings?
Show passion for large-scale projects, variety of challenges, and long-term impact. Connect to company projects like highways or airports.
HR and Company Fit
- 13
What do you know about GVK Group and its projects?
Mention key sectors like energy, airports, transportation, and urban infrastructure. Show awareness of their major projects and reputation.
- 14
Are you willing to relocate to project sites?
Answer positively, expressing adaptability and eagerness to gain site experience. Mention flexibility as a key trait for the role.
- 15
How do you keep yourself updated with the latest estimation software and industry practices?
Talk about following industry journals, online courses, and networking. Mention specific tools like AutoCAD, MS Project, or CostX.
- 16
What are your short-term and long-term career goals?
Align goals with the role: short-term to learn and contribute, long-term to lead cost management. Show commitment to growing within the company.
Ready to try it for real?